Production Attainment
89%
-4.1% vs shift plan
COO · Plant Director · Operations Control
Synthetic data notice: this is a functional reference workspace with generated operating records. It demonstrates product behavior and implementation patterns, not a customer deployment.
4/4 data domains online
No stale feeds · 21s freshness
Production Attainment
89%
-4.1% vs shift plan
OEE
84.0%
2.4 pts vs target
Unplanned Downtime
11.5h
62 min last 6h
On-Time Delivery
91.2%
78% warehouse utilization
| Asset | State | OEE | Throughput | Downtime | Yield |
|---|---|---|---|---|---|
| Line 1 · Mixing | RUNNING | 87.2% | 108 units/h | 14 min | 98.4% |
| Line 2 · Filling | ATTENTION | 71.8% | 82 units/h | 46 min | 96.1% |
| Line 3 · Packaging | RUNNING | 79.4% | 91 units/h | 31 min | 97.3% |
| Line 4 · Mixing | RUNNING | 91.1% | 116 units/h | 7 min | 99.1% |
| Line 5 · Filling | RUNNING | 86.7% | 111 units/h | 12 min | 98.8% |
| Line 6 · Packaging | WATCH | 82.3% | 103 units/h | 18 min | 98.2% |
Est. 420 units at risk · Owner: Dimas / Shift A
9 trucks projected by 16:00 · Owner: Logistics Control
+7.8% peak demand · Owner: Energy Team
Re-slot before evening inbound · Owner: Warehouse Lead